Boiler test Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Boiler test? On this page you'll find 1107 study documents about Boiler test.
All 1.107 results
Sort by
-
Oil Burner License Exam 2023 Questions and Answers
- Exam (elaborations) • 18 pages • 2023
- Available in package deal
-
- $12.49
- 3x sold
- + learn more
What is the first thing a tech should do when arriving at a no combustion call? - Answer- Ask how many times the customer reset the unit. 
 
What is the best long term solution for preventing a clogged nozzle? - Answer- -Remove any underground storage tanks. 
-Install a quality oil filter. 
-Cut the suction line 10" above the tank outlet to prevent sludge. 
 
Hot water and steam valves are interchangeable. - Answer- False 
 
When in the presence of a flame, a cad cell normally reads.. - Answer...
-
Journeyman Oil Maine Fuel Board Rules questions with correct answers
- Exam (elaborations) • 23 pages • 2023 Popular
- Available in package deal
-
- $16.49
- 2x sold
- + learn more
What must you do if you notice code violations in a homeowners house? - Answer Notify them and recommend ways to address them 
 
What must be done when performing an annual tune-up on a heating system? - Answer A combustion efficiency test and a copy must be posted on site 
 
Whenever a furnace, direct fired hot water heater, or boiler is installed the total installation must be brought into compliance with what requirements BEFORE appliance can be fired? - Answer NFPA 31 
 
When an eme...
-
CLASS 5 BOILER TEST QUESTIONS AND ANSWERS
- Exam (elaborations) • 31 pages • 2024
- Available in package deal
-
- $10.49
- 1x sold
- + learn more
CLASS 5 BOILER TEST
-
Boilermaker NCCR Test (Latest) Questions With 100% Correct Ans..
- Exam (elaborations) • 10 pages • 2024
-
- $13.99
- 1x sold
- + learn more
Boilermaker NCCR Test (Latest) Questions With 100% Correct Ans..
-
SPECIAL ENGINEER BOILER TESTS COMPILATION BUNDLE
- Package deal • 14 items • 2023
-
- $30.49
- 2x sold
- + learn more
SPECIAL ENGINEER BOILER TESTS COMPILATION BUNDLE
-
Boilermaker NCCR Test Questions And Answers
- Exam (elaborations) • 10 pages • 2024
-
- $10.99
- 1x sold
- + learn more
Boilermaker NCCR Test Questions And Answers 
Boilermaker NCCR Test 
 
 
 
 
 
1 ft 3-3/4 in + 2 ft 1-1/16 in +5 ft 10- 7/8 in = - ANS 9 ft 3-11/16 in 
 
A 1-inch plate is to be cut. Why should an acetylene gerulator on a cutting rig not be adjusted over 15 PSI? - ANS Acetylene is unstable above this pressure 
 
A big control valve is pulled who is responsible for the rigging? - ANS Crane operator and rigger 
 
A boiler maker must have all of the following wh...
-
Minnesota Special Engineer Boiler License Exam Prep (2023/2024 Update) | Questions and Verified Answers| 100% Correct
- Exam (elaborations) • 56 pages • 2023
- Available in package deal
-
- $11.49
- 1x sold
- + learn more
Minnesota Special Engineer Boiler License Exam Prep (2023/2024 Update) | Questions and Verified Answers| 100% Correct 
 
Q: A feed water line must have what two valves? 
 
 
Answer: 
Check & stop 
 
 
 
Q: After a new boiler is installed, what must be performed? 
 
 
Answer: 
Hydrostatic test 
 
 
 
Q: All stationary boilers of what pressure must have 2 valves on the blow off line? 
 
 
Answer: 
100psi 
 
 
 
Q: How is boiler efficiency calculated? 
 
 
Answer: 
Output divided by input 
 
 
 
Q:...
-
Nyc high pressure boiler license Exam Questions with Correct Answers
- Exam (elaborations) • 22 pages • 2024
- Available in package deal
-
- $13.29
- 1x sold
- + learn more
Nyc high pressure boiler license 
Exam Questions with Correct 
Answers 
 
The minimum blowdown for a spring loaded safety valve shall be of what percent of set 
pressure? - Answer-10% 
How is the main steam pressure gages tested? - Answer-With an inspectors gage 
Who is in charge of the code for any plumbing installations? - Answer-The nyc plumbing 
code 
When will anchorage or guides be inspected? - Answer-Annually 
How many brass washout plugs does a miniature boiler have? - Answer-3 brass 
wa...
-
Fdny p-99 c of f Exam 2024 Questions & Answers (RATED A+)
- Exam (elaborations) • 6 pages • 2024
-
- $10.49
- 2x sold
- + learn more
What is a general requirement of the location of the installation of a boiler? - ANSWERSAdequate clearance from combustile construction 
 
What temperature must the materials remain under during combustion? - ANSWERS170 degrees 
 
What is a requirement for the access of the boiler? - ANSWERSAccess for operation and maintenance must not be hazardous 
 
What is required upon installation to operate a boiler? - ANSWERSInspection and test resulting in equipment use permit from commissioner 
 
How of...
-
Ohio Boiler Test Questions and Answers Graded A+
- Exam (elaborations) • 40 pages • 2024
-
- $11.49
- + learn more
Ohio Boiler Test Questions and Answers 
 
Graded A+ 
 
The pressure at the base of a vertical foot of water is 0.433 psi. 
 
When performing a hydrostatic test, the pressure on the boiler should be increased to 1 1⁄2 
times the safety valve setting . 
 
A boiler steam pressure gauge should have a range of 1 1⁄2 to 2 times the safety valve setting: 
 
The maximum size of the bottom blowdown line and the surface blowdown line is 2 1/2" 
 
During startup, the boiler vent should remain open unt...
-
Low pressure boiler practice test fully solved 2023/2024
- Exam (elaborations) • 3 pages • 2023
- Available in package deal
-
- $9.99
- 1x sold
- + learn more
Low pressure boiler practice test 
Water, heat and container - correct answer Is necessary to generate steam in a boiler 
 
Heating surface - correct answer The _____ is the part of the boiler with water on one side and heat on the other 
 
Firetube - correct answer A _____ boiler has heat and gases of combustion that pass through tubes surrounded by water 
 
Watertube - correct answer A _____ boiler has water in the tubes and heat and gases of combustion passing around the tubes 
 
Baffles - co...