Classtie
On this page, you find all documents, package deals, and flashcards offered by seller Classtie.
- 623
- 0
- 24
Community
- Followers
- Following
1 items
HWLC ITAS EXAMS
Actions during fire delay - Gyro spins to 42,000 rpm and the Pre-Fire sequence is sent to the 
missile 
Allowable degree of cant - 10 degrees left or right 
Armour penetration - over 30" 
Battery life - Surveillance 32- 126 degrees 14.5 hours 
surveillance 25- 32 degrees 9- 14.5 hours 
Max Power: 32-126 degrees 10 hours 
Break Bridge Clamp - Severs the command link wires 
turns off the Xenon Tracker 
Building engagements - TOW BB: Fire adjacent to a door or below a window 
TOW 2B: In line of si...
- Exam (elaborations)
- • 6 pages •
Actions during fire delay - Gyro spins to 42,000 rpm and the Pre-Fire sequence is sent to the 
missile 
Allowable degree of cant - 10 degrees left or right 
Armour penetration - over 30" 
Battery life - Surveillance 32- 126 degrees 14.5 hours 
surveillance 25- 32 degrees 9- 14.5 hours 
Max Power: 32-126 degrees 10 hours 
Break Bridge Clamp - Severs the command link wires 
turns off the Xenon Tracker 
Building engagements - TOW BB: Fire adjacent to a door or below a window 
TOW 2B: In line of si...